Reports Sumatra Merang Peatland Project Monitoring Report 2025 2.1.8 Project Location

2.1.8 Project Location

2 Project Details › 2.1 Summary Description of the Implementation Status of the Project · reference VCS, 3.11; CCB, G1.3 · 5 hours spent

Workflow
Reassign Request review

Open › Drafting › Reviewing › Approving › Completed

Drafted by RN Roy Niels since 2026-10-08T09:30:00. No reviewers yet.

Content
Start from an example text Save as example text AI assistant Preview
Fields in this section

The values in the text, as they are in the preview and the PDF. Values from the calculation 2026-10-08T16:31:00, the GIS platform and the monitoring platform 2026-10-10T06:00:00.

Field Value Source

The values are fixed when the document is sent to the auditor.
Requirement and guidance

VCS 3.11, CCB G1.3. Describe the project location, including the geographic boundaries of the project area, and provide a map and the geodetic coordinates. Describe the project zone and the communities in it.

From the template: Use the boundary version the calculation uses, not the one from the project description. The coordinates are in the asset details on the GIS platform.

Comments
JD The area in the second paragraph should come from the latest boundary version (v2.1), not the one from the project description. 2026-10-09T10:15:00
Comment
Start from an example text

Replaces the text of this section with the example text. Your current text stays in the history.

Example text
Load
Request review
Reviewer MessageOptional, sent with the notification.
Request review