Reports Sumatra Merang Peatland Project Monitoring Report 2025 Preview

Preview

The full document in the Verra CCB and VCS v4.4 style, as it is exported to PDF. Guests can only see this page.

Table of contents
Monitoring Report 2025
Back to the sections Download as PDF

1 Summary of Project Benefits

1.1 Unique Project Benefits

This monitoring report covers the second monitoring period of the Sumatra Merang Peatland Project, from 1 January 2024 to 31 December 2025. In this period the project avoided an estimated 182,430 tCO2e of emissions from deforestation and forest degradation, and from the drainage of peat, and removed 12,940 tCO2e through assisted natural regeneration.

1.2 Standardized Benefit Metrics

Item Value
Monitoring period 2024-01-01 to 2025-12-31
Emission reductions (REDD) 182430 tCO2e
Removals (ARR) 12940 tCO2e

2 Project Details

2.1 Summary Description of the Implementation Status of the Project

2.1.8 Project Location

The project is located in the Merang peat dome, in the Musi Banyuasin Regency, South Sumatra, Indonesia. The project area covers 22,935 hectares of peat swamp forest.

During the monitoring period the boundary was updated to version 2.1, which adds 112 hectares of peat swamp forest along the northern edge.