Final
A calculation of Monitoring Report 2025. It is the calculation that is used in the document, so its results fill in the tables of the calculation in the media. This page shows the results, the constants it was run with and the monitoring period it was calculated on.
This calculation is used in the document, run it again to update the tables in its media.
The constants start with the default values of the methodology. Change one only when this project has a better value, and say where it comes from in the document.
| Constant | Value | Default | Uncertainty | Unit | |
|---|---|---|---|---|---|
| Stratum | Undrained | Shallowly drained | Fully drained | ||||
|---|---|---|---|---|---|---|---|
| CO₂ | CH₄ | CO₂ | CH₄ | CO₂ | CH₄ | ||
A monitoring report is calculated on a monitoring period of the GIS platform. The monitoring period comes with the baseline and the performance benchmark it is measured against, and its last year is the verification year.
| Period | 2024 to 2025, verification year 2025 |
|---|---|
| Baseline | Version 1.0, from 2020 |
| Performance benchmark | Version 1.0 |
The calculation that is used in the document can't be deleted. Use another calculation first.